High quality ceramic materials and products from Khalach: Perspecive business project
Representative of non-government section of national economy consolidate their positions in construction industry and production of construction materials. Plant for production of ceramic materials, which was built in Khalach etrap, Lebap Velayat, is one examples of this. This is the first in the country fully automated facility, which is targeted to production of wide variety of decorative items.
The complex with output capacity of 200,000 tons of production per year was built by the work request of Döwletli Döwran Business entity by Eziz doganlar construction company. The plant is located next to Turkmenabat – Kerky railroad and few kilometres away fro clay pits. Chemical composition of the material was tested in laboratories of several European countries.
The first train of the facility is designated for production of ceramic construction materials. The complex of operation facilities includes production facility with total area of 1.5 hectares, administrative building, technical services.
Daily production output of industrial facility is 550 tons. The workshops are provided with modern digital equipment from the leading manufacturers from Europe and Japan. Innovative technology allows producing strong, lightweight and various construction and decorative materials.
High productive crushers and mills for grinding of clay, silos for storage of components, conveyor lines, mixers, hydraulic escalators, extruders, dryers, tunnel furnaces for tempering of ceramics, robots. Operation and control of all links of technological chain from putting go material to bunkers until making recipe and packing of ready-made items to thermal film are carried out remotely by programme software.
The facility implements full cycle of production of clinker brick for exterior decoration of buildings and facilities with production output of 80 million bricks per year as well as thermal resistant blocks designated for interior partitions and paving tiles, which is able to hold the load of 50 tons.
In the future, it is planned to arrange the production of dry mixtures, ceramic tiles and steps, terracotta façade tiles and other products. Production of façade tiles and thin ceramics will start after opening of the second train of the plant.